Putney Bridge — the most heavily used Thames crossing west of central London — needs major repairs to its badly potholed road surface as well as to its main structure.
Wandsworth council, which is responsible for the 127-year-old bridge, wants the work to be done during one continuous closure in 2015 when only pedestrians would be able to use it."